Sign In | Join Free | My lightneasy.org
China Chongqing Hengtairail Equipment Co.,Ltd. logo
Chongqing Hengtairail Equipment Co.,Ltd.
Global Rolling Stock Parts Supplier
Verified Supplier

4 Years

Home > Railway Braking System >

JZ-7 Train Brake Valve 500kPa 600kpa Railway Braking System

Chongqing Hengtairail Equipment Co.,Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

JZ-7 Train Brake Valve 500kPa 600kpa Railway Braking System

  • 1
  • 2

MOQ : Ngotiable

Price : Ngotiable

Payment Terms : L/C, T/T

Supply Ability : 50000 pcs per month

Delivery Time : Ngotiable

Packaging Details : Export packaging

Place of Origin : China

Product Name : Railway Brake Valve JZ-7 Parts

Ambient temperature : -40℃~50℃

Package : Export package

Constant pressure of train pipe : 500kPa, 600kpa

Application : Railway diesel locomotive

Contact Now

Train brake valve JZ-7 railway coach brake valve

JZ-7 Brake valve may be used not only on passenger locomotives but also on freight locomotives.

It has the ability to gradually release at passenger locomotive, and directly release at freight locomotive.

JZ-7 mainly consists of automatic brake valve (large brake), separate brake valve (small brake), relay valve, distribution valve, application valve ect.

Product Name Railway Brake Valve JZ-7 Parts
Ambient temperature -40℃~50℃
Package Export package
Constant pressure of train pipe 500kPa, 600kpa
Application Railway diesel locomotive

Performance:

1. Time for initial charge of pressure reservoir of distributing valve from 0 to 460 kPa : 50~60s

2. Time for initial charge of pressure reduction reservoir of distributing valve from 0 to 480 kPa : 55~65s

3. Effective local reduction of brake pipe (KPa): 25~35

4. Local reduction should take effect before brake pipe of the single locomotive reduces pressure to 20 kPa. At the same time, the main valve acts: starting local reduction and brake cylinder lifting pressure

5. Graduated release times after in full service application: not less than 5 times (at the passenger train position)

6. Time for pressure reduction in equalizing reservoir in service application from 500KPa to 360KPa (S): 5~7

7. Max. brake cylinder pressure in full service application (KPa): 340-360

8. Time for build-up of brake cylinder pressure in full service application (S): 5-7

9. Time for release of brake cylinder pressure from 350KPa to 35KPa (S): 5~8

10. Time for exhaust of brake pipe to 0 in emergency application (S): within 3s

11. Max brake cylinder pressure after emergency application (KPa): 420~450

12. Time for build-up of brake cylinder pressure to max. after emergency application (S): 5~7

Performance of independent braking:

Highest brake cylinder pressure in full application position (KPa): 300

1. Time for build-up of brake cylinder pressure from 0 to 280KPa (S): within 3s In running position,

2. time for reduction of brake cylinder pressure from 300Kpa to 35Kpa (S): within 4s

Application

Related products

1. MUD distributor valve

2. Brake cylinder

3. RGC-1A Sensor Valve

4. Auxiliary reservoir

5. Air brake hose assembly

6. Throttle

7. Slack Adjuster

8. Caboose Valve

9. Angle cock


Product Tags:

JZ-7 train brake valve

      

train brake valve 500kPa 600kpa

      

500kPa Brake Valve Railway Braking System

      
Buy cheap JZ-7 Train Brake Valve 500kPa 600kpa Railway Braking System product

JZ-7 Train Brake Valve 500kPa 600kpa Railway Braking System Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Chongqing Hengtairail Equipment Co.,Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)